Brookfield Subdivision

Sector
Civil Construction
Client
CBoP
Location
Brookfield
Status
Complete

Overview

DMC was engaged to complete the earthworks for a residential subdivision, including topsoil and unsuitable material removal, importation of over 1,500m³ of engineered fill, and raising the existing ground level by up to 4 metres — all delivered to a Level 1 specification.

Scope of work

The construction phase included
  • Completion of the final civil design.
  • preparing the site to receive fill
  • Site investigations for contamination.
  • Importing 1500m3+
  • Level 1 geotechnical supervision